Contracts No. CAPH 060/91, 049/91, 096/91, 048/91, 059/91, 026/91, September 1991
Consulting related to specialized activities for the assembly and construction of the siphon for the aqueduct, specialized advice and inspection of the protection and drainage of the siphon's slopes over the Santiago River, consulting for the formulation of unit prices, evaluation and appraisal of the assembly and construction work concepts for the siphon over the Santiago River in the Calderón-San Gaspar Aqueduct, in the State of Jalisco for SIAPA.
Cliente: Sistema Intermunicipal de los Servicios de Agua Potable y Alcantarillado – SIAPA
Monto Total $ 229,567.92 USD
Contract No. CNA-CAMP-95 0008D of March 1995, State of Campeche
Rehabilitation and Commissioning of Six Pump Stations, as well as Protection and Control Devices for the Aqueduct, Repair of Specific Failures, and Pipe Cleaning. Damaged by Hurricane 'Roxanne.
Client: National Water Commission – CNA
Total Amount: $142,270.13 USD

Contract No. S/N of April 1998
Manufacturing and Installation of 2 Air Chambers for Surge Protection, part of the Papagayo Project, in the State of Guerrero
Client: National Water Commission – CNA
Total Amount: $139,453.53 USD
Contract No. S/N of July 1998
State of Guerrero: Electromechanical Installation of 4 Intake Sluice Gates
Client: La Nacional Construction Company.
Total Amount: $23,527.98 USD
Contract No. S/N of May 2000
Service to Mechanisms of the 4 Sluice Gates, Concrete Scarification of Right Service Gate, Replacement of Upper Seal on Right Service Gate. Client: National Water Commission – CNA
Total Amount: $4,917.59 USD
Contract No. SGC-GRB-GRO-00-004 I of August 2000
Electrification and Lighting of the Dam and Dike for the 'El Gallo' Reservoir, in the State of Guerrero. Client: Ministry of Environment, Natural Resources, and Fisheries, through the CNA.
Total Amount: $73,860.10 USD
Contrato N° SGIHUI-92-208 de Mayo de 1992
Supervisión y coordinación de campo de los complementarios para el diseño detallado de trabajos de exploración geológica y topográficos para estructuras del Sistema de Bombeo el Purgatorio, localizado en el Edo. de Jalisco.
Client: National Water Commission – CNA
Monto Total $ 49,160.99 USD
Contract No. SGC-FA-2000-20 D of March 2000, State of Guerrero
Electromechanical Installation of the Sand Removal System, including the supply and installation of three gates with their respective mechanisms, control systems, and power systems for the plant.
Client: Ministry of Environment, Natural Resources, and Fisheries, through the CNA.
Total Amount: $234,217.21 USD
Contract No. SGC-RPS-2000-012 I of May 2000
Construction of Safety Brackets on the Fast Track of the 'Arroyo Aguas Blancas,' in Acapulco, Guerrero.
Client: Ministry of Environment, Natural Resources, and Fisheries, through the CNA.
Total Amount: $77,675.43 USD
Contracts No. 00458-VDM-PO-001 DIN and 00479-VDM-PO-002 DIN of March 2001
Construction of Temporary Offices and Warehouse for the Buyer.
Client: Alstom Contracting, S.A. de C.V.
Total Amount: $124,796.66 USD
Contract No. 0811RE-0005/01-05-MA of July 2009-2010
Manufacturing (Cutting, Assembly, and Welding), Application of Corrosion-Resistant Coating, Transport, and Installation of the Metal Structure of the Ceilán Bridge. Includes: Workshop Engineering, Preparation of Workshop Drawings, Quality Dossier, Unloading of Structural Steel, Loading and Unloading of Manufactured Parts, Transport, Machinery, Equipment, Crane for Installations, Tools, Materials, and Labor for the Construction of the Río de los Remedios – Ecatepec Highway.
Client: Ingenieros Civiles Asociados – ICA
Total Amount: $1,574,960.46 USD
Contract 45-98 of May 2012
Installation, Leveling, Alignment, and Fixing of 8 Sand Classifiers, 31-meter-long Conveyor Belts, and Bucket Elevator, as well as the Supply, Fabrication, and Installation of Operation Platform for Elevators and Tova with Gate for the Atotonilco WWTP Project located at Km. 6 San Antonio – San José Acoculco Road, Ejido 'Conejos,' Municipality of Atotonilco de Tula, Hidalgo.
Client: Sociedad de Aguas Hispano Mexicanas, S.A. de C.V. (Acciona Consortium and
Atlatec)
Total Amount: $105,294.26 USD
Contract 45-133 of June 2012
Execution of the Formation and Assembly Fit-up of Grease Concentrator for Area 100 and Area 250 TPQ
Client: Sociedad de Aguas Hispano Mexicanas, S.A. de C.V. (Acciona and Atlatec Consortium)
Total Amount: $769,230.77 USD
Contract 45-209 of February 2013
Supply, fabrication, and installation of carbon steel and plastic pipes, as well as the supply, fabrication, and installation of carbon steel supports for the same area 300 zone 1.
Client: Sociedad de Aguas Hispano Mexicanas, S.A. de C.V. (Acciona and Atlatec Consortium)
Total Amount: $1,968,340.52 USD
Contract No. S/N 2010 – 2014. Panama Duero Latina
Project Management and Installation of Valves & Appurtenances (Third Set of Locks) in the Panamá Canal Expansion Project.
Client: Hyundai Samho Heavy Industries Co. Ltd.
Contract Amount: $19,644,955.62 USD
Addendum: Contract Amount Increase of $4,720,000.00
Total Amount: $24,364,955.62 USD
General Information: The Panama Canal Expansion Program involves the construction of two three-level Lock Complexes, each with three Water Reuse Basins per level, one on the Pacific side and one on the Atlantic side.
The installation contract involves the installation of 696 fixed parts of gates of various sizes, approximately 40 meters in height, 60 fixed parts for screens, installation of 152 roller-type service gates, and functional and seal tests of 544 maintenance bays with sliding gates, as well as the assembly of 60 sets of grilles.
Grupo Unidos por El Canal, comprised of Sacyr Vallehermoso (SyV), Impregilo
Grup, Jan de Nul Group, and Constructora Urbana (CUSA).
Contracts No. S/N of July 30, 2013.
Installation, transportation, and assembly of 152 servomotors, 152 hydraulic power units, and 22,000 meters of stainless steel piping for the hydraulic system of the sewerage, ducts, and stabilizing valves (gates) for the Panama Canal Expansion Project.
Client: BOSCH REXROTH
Total Amount: $2,729,083.59 USD
Contract PO 4560144265 dated June 18, 2019
Supply, installation, and commissioning of the industrial services for the plant in the Mariel Industrial Zone in Cuba with the following scope: supply and installation of potable water equipment, supply and installation of compressed air equipment, supply and installation of LP gas equipment, supply and installation of chilled water equipment, supply and installation of ventilation equipment, supply and installation of pipe racks.
Client: Nestrade (Switzerland).
Total Amount: $3,165,000.00 USD
Conducting studies, fieldwork, and engineering for the construction and procurement of equipment for the "El Cuchillo II Aqueduct," which runs from the El Cuchillo dam located in the Municipality of China to the San Roque water treatment plant in the Municipality of Monterrey, with an approximate length of 92 km. This project includes five fully equipped pumping stations with new 32 MW substations and an 84-inch diameter carbon steel transmission pipeline with all its mechanical, electrical, control equipment, and hydraulic transient mitigation devices.
Client Garza Ponce Construction Company
Total Amount $ 2’700,000 USD


