Expertise

Energy

Installation, rehabilitation and modernization of power plants and associated systems, covering turbines, generators, auxiliary equipment and electrical infrastructure.

Scope

Installation and modernization

  • Electromechanical disassembly and assembly of units
  • Integration of manufacturer equipment and complementary systems
  • Heavy-lift planning and site logistics
  • Procedures and quality assurance

Infrastructure and testing

  • Substations and transmission lines
  • Transformers and auxiliary electrical systems
  • Equipment testing against specifications
  • Commissioning support when included in the contract
Energy — Illustrative photograph of sector infrastructure, not of the project
Illustrative image

Equipment and systems

Turbines and generators

Convert water energy into electrical energy. Malpaso and Angostura document turbine and generator work; Peñitas documents generator work.

Complementary systems

Support generating-unit operation and integration within each plant’s specific scope.

Substations and transmission

Transform voltage levels and connect generation to the grid through electrical equipment and installations.

Equipment installation, testing and commissioning support are distinct scopes. Not every reference includes all three: consult its documented project work.

Related projects

Malpaso Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the projectIn executionIllustrative image

Chiapas, Mexico/Energy

Malpaso Hydroelectric Power Plant

1,200 MW addressed

Plant repowering: electromechanical disassembly and assembly of six turbines and generators of 200 MW each, together with their complementary systems.

View project
Angostura Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the projectIn executionIllustrative image

Chiapas, Mexico/Energy

Angostura Hydroelectric Power Plant

1,000 MW addressed

Electromechanical works associated with the installation of five turbines and generators of 200 MW each, with their complementary systems and execution logistics.

View project
Peñitas Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the projectIn executionIllustrative image

Chiapas, Mexico/Energy

Peñitas Hydroelectric Power Plant

420 MW addressed

Electromechanical disassembly and assembly of four 105 MW generators and their complementary systems, with procedures, quality assurance and testing support.

View project
Huites Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the projectIllustrative image

Sinaloa, Mexico/Energy

Huites Hydroelectric Power Plant

Works documented in 1993

2 × 230 MW Francis turbines

A reference from the technical track record of the team and predecessor companies: electromechanical equipment installation and commissioning, including two 230 MW Francis turbines. Siemens México is named in the documented reference.

View project
El Cajón Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the projectIllustrative image

Nayarit, Mexico/Energy

El Cajón Hydroelectric Power Plant

Works documented in 2004

Installation and commissioning

A reference from the technical track record of the team and predecessor companies: electromechanical installation and commissioning of turbine-generator units. Power Machines de México is named in the documented reference.

View project
La Yesca Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the projectIllustrative image

Jalisco / Nayarit, Mexico/Energy · Water Infrastructure

La Yesca Hydroelectric Power Plant

Hydromechanical works documented in 2011–2012

2 units of 375 MW

Installation of two 375 MW turbine-generator units with testing and commissioning support, plus hydromechanical works on bulkheads, energy-dissipation chambers and large-diameter pipelines.

View project
View full portfolio