Duero Engineering Group · Our History

A history of engineering that spans generations

Technical knowledge passed on, experience that evolves and new capabilities applied to energy, water and industrial projects.

Illustrative image of hydroelectric infrastructure

60+
Years of technical experience across our team and member companies
5+
Countries with project experience
30+
Hydroelectric projects
4,000+
MW across installation and modernization projects

These figures reflect the combined track record of our team and the group's member companies. The MW figure refers to the capacity of the units and projects we have taken part in; it does not represent plants we own, energy produced, or capacity installed by a single company.

The 60-plus years of experience refer to the combined track record of the team and the group's member companies, not to the age of a single entity.

Origins and evolution

A track record that predates the current structure.

Technical foundations

Our history draws on more than 60 years of accumulated experience among the people and companies that gave rise to the group. Field knowledge, installation and commissioning are part of that track record, which predates the current organization.

From early references to integration

Documented references include Huites in 1993 and El Cajón in 2004. The corporate CV places the consortium’s beginning in 2011: an integration milestone, distinct from the earlier track record and each company’s legal incorporation.

Evolving capabilities

The track record includes hydromechanical scopes at La Yesca, lock installations in the Panama Canal and water engineering at El Zapotillo and El Cuchillo II. Today it brings together engineering, management, construction and installation for energy, water and industry.

Generations and continuity

Experience is shared. Responsibility is earned.

Continuity across generations of the family is part of Duero’s history. Its value lies in sharing technical knowledge, learning from fieldwork and developing professional judgement with responsibility.

Each generation brings a new perspective to accumulated experience: preserving technical rigour while evolving with the needs of each project.

Documented references

Projects that are part of our history.

Years refer to documented scopes, not to the full construction period of each project.

  1. 1993

    Huites Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the project

    Illustrative image

    Sinaloa, Mexico

    Huites Hydroelectric Power Plant

    A reference from the technical track record of the team and predecessor companies: electromechanical equipment installation and commissioning, including two 230 MW Francis turbines. Siemens México is named in the documented reference.

    View project
  2. 2004

    El Cajón Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the project

    Illustrative image

    Nayarit, Mexico

    El Cajón Hydroelectric Power Plant

    A reference from the technical track record of the team and predecessor companies: electromechanical installation and commissioning of turbine-generator units. Power Machines de México is named in the documented reference.

    View project
  3. 2011–2012

    La Yesca Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the project

    Illustrative image

    Jalisco / Nayarit, Mexico

    La Yesca Hydroelectric Power Plant

    Large-diameter hydromechanical works on diversion, discharge and energy-dissipation systems; COHYSA is named in the documented 2011–2012 reference. This period applies to that scope, not to all plant activities.

    View project
  4. 2022

    El Zapotillo Dam — Illustrative photograph of sector infrastructure, not of the project

    Illustrative image

    Jalisco, Mexico

    El Zapotillo Dam

    Rehabilitation of intake works and bottom-outlet infrastructure, with supply and installation of pipelines and components, testing, and medium- and low-voltage electrical works.

    View project
  5. 2023

    El Cuchillo II Aqueduct — Illustrative photograph of sector infrastructure, not of the project

    Illustrative image

    Nuevo León, Mexico

    El Cuchillo II Aqueduct

    Multidisciplinary engineering for five pumping plants and the 84-inch conveyance line, with transient analysis, interface coordination and technical support for implementation.

    View project

Another reference from our track record

Panama Canal Expansion · Panama

Installation of hydromechanical equipment and hydraulic systems for the locks, including gates, operating mechanisms, hydraulic power units and pipelines. Our participation covers specific hydromechanical equipment scopes within the canal expansion programme, not the construction of the waterway as a whole.

View project

Continuity into the present

Accumulated experience, applied to the next challenge.

Duero Engineering Group is an organization that brings together engineering, project management, construction and installation for energy, water and industrial projects. Its companies combine design, manufacturing, supply and site execution capabilities, so a single project can be covered from engineering through to commissioning support.

How we work

From contracted scope to documentation handover.

  1. 01

    Scope definition

    Review of technical bases, site conditions and interfaces with other contractors to define responsibilities and deliverables.

  2. 02

    Planning

    Work schedules, lift sequences, resources, execution procedures and quality and safety plans.

  3. 03

    Coordination

    Integration of disciplines, manufacturers and work fronts, with document control and technical communication with the client.

  4. 04

    Execution

    Installation, rehabilitation or construction with site supervision, progress control and activity records.

  5. 05

    Quality control and testing

    Inspections, protocols and support for pre-operation testing, according to project specifications.

  6. 06

    Documentation handover

    As-built drawings, quality records and technical closeout of the contracted scope.

This sequence describes available capabilities; the actual scope of each contract is defined with the client.

Group companies

Complementary capabilities under one technical coordination.

The names shown are those in current use. Full legal names, shareholdings and company-specific exclusive specialities are not published.

  • Dusgem

    Member company of the group.

  • Duero Ingeniería

    Member company of the group in Mexico.

  • Duero Latina

    Member company of the group.

  • Duero America

    Member company of the group.

  • Cúbica 1000

    Member company of the group.

  • Hydroproject

    Member company of the group.

Presence

Mexico, Panama and Ecuador, with regional experience.

MexicoOffice
Mexico City. Base for engineering, project management and site coordination.
PanamaOffice
Panama City. Support for hydromechanical equipment and installation projects.
EcuadorOffice
Quito. Local presence for energy and infrastructure projects.
Other countries in the regionProject experience
Participation in energy and infrastructure projects in more than five Latin American countries, without a permanent office.