Skip to main content
Back to projects

Water infrastructure · Industry

Panama Canal Expansion

Installation of hydromechanical equipment and hydraulic systems for the locks, including gates, operating mechanisms, hydraulic power units and pipelines.

Location
Panama
Period
—
Panama Canal Expansion — Illustrative photograph of sector infrastructure, not of the project
Illustrative image

Scope

  • Installation of lock gates
  • Operating mechanisms
  • Hydraulic power units
  • Pipelines and associated systems

Our participation covers specific hydromechanical equipment scopes within the canal expansion programme, not the construction of the waterway as a whole.

Related projects

La Yesca Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the project

Jalisco / Nayarit, Mexico/Energy · Water infrastructure

La Yesca Hydroelectric Power Plant

2 units of 375 MW

Installation of two 375 MW turbine-generator units with testing and commissioning support, plus hydromechanical works on bulkheads, energy-dissipation chambers and large-diameter pipelines.

View project
El Cuchillo II Aqueduct — Illustrative photograph of sector infrastructure, not of the project

Nuevo León, Mexico/Water infrastructure

El Cuchillo II Aqueduct

84-inch conveyance line

Multidisciplinary engineering for five pumping plants and the 84-inch conveyance line, with transient analysis, interface coordination and technical support for implementation.

View project
El Zapotillo Dam — Illustrative photograph of sector infrastructure, not of the project

Jalisco, Mexico/Water infrastructure · Energy

El Zapotillo Dam

Intake works and bottom outlet

Rehabilitation of intake works and bottom-outlet infrastructure, with supply and installation of pipelines and components, testing, and medium- and low-voltage electrical works.

View project

Next step

Tell us the technical scope you need to cover.

We review technical bases, site conditions and interfaces to propose a realistic scope with the group's companies.