Electromechanical works associated with the installation of five turbines and generators of 200 MW each, with their complementary systems and execution logistics.
Electromechanical disassembly and assembly of four 105 MW generators and their complementary systems, with procedures, quality assurance and testing support.
Jalisco / Nayarit, Mexico/Energy · Water infrastructure
La Yesca Hydroelectric Power Plant
2 units of 375 MW
Installation of two 375 MW turbine-generator units with testing and commissioning support, plus hydromechanical works on bulkheads, energy-dissipation chambers and large-diameter pipelines.
Installation of hydromechanical equipment and hydraulic systems for the locks, including gates, operating mechanisms, hydraulic power units and pipelines.
Multidisciplinary engineering for five pumping plants and the 84-inch conveyance line, with transient analysis, interface coordination and technical support for implementation.
Rehabilitation of intake works and bottom-outlet infrastructure, with supply and installation of pipelines and components, testing, and medium- and low-voltage electrical works.
The “In execution” status of Malpaso, Angostura and Peñitas was confirmed in September 2026. For the remaining projects only the documented period is stated.