Skip to main content
Back to projects

Water infrastructure

El Cuchillo II Aqueduct

Multidisciplinary engineering for five pumping plants and the 84-inch conveyance line, with transient analysis, interface coordination and technical support for implementation.

Location
Nuevo León, Mexico
Period
Engineering documented in 2023
El Cuchillo II Aqueduct — Illustrative photograph of sector infrastructure, not of the project
Illustrative image

Scope

  • Multidisciplinary engineering for five pumping plants
  • 84-inch conveyance line
  • Hydraulic transient analysis
  • Coordination of interfaces between disciplines
  • Technical support during implementation

Our participation covers engineering and associated scopes; construction of the complete aqueduct is not attributed to the group.

Related projects

La Yesca Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the project

Jalisco / Nayarit, Mexico/Energy · Water infrastructure

La Yesca Hydroelectric Power Plant

2 units of 375 MW

Installation of two 375 MW turbine-generator units with testing and commissioning support, plus hydromechanical works on bulkheads, energy-dissipation chambers and large-diameter pipelines.

View project
Panama Canal Expansion — Illustrative photograph of sector infrastructure, not of the project

Panama/Water infrastructure · Industry

Panama Canal Expansion

Hydromechanical equipment for the locks

Installation of hydromechanical equipment and hydraulic systems for the locks, including gates, operating mechanisms, hydraulic power units and pipelines.

View project
El Zapotillo Dam — Illustrative photograph of sector infrastructure, not of the project

Jalisco, Mexico/Water infrastructure · Energy

El Zapotillo Dam

Intake works and bottom outlet

Rehabilitation of intake works and bottom-outlet infrastructure, with supply and installation of pipelines and components, testing, and medium- and low-voltage electrical works.