Energy

Malpaso Hydroelectric Power Plant

Plant repowering: electromechanical disassembly and assembly of six turbines and generators of 200 MW each, together with their complementary systems.

Location
Chiapas, Mexico
Status
In execution
Malpaso Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the project
Illustrative image

Scope

  • Electromechanical disassembly and assembly of six turbines and generators of 200 MW each
  • Installation of complementary systems
  • Heavy-lift planning and execution procedures
  • Quality assurance
  • Support for testing and commissioning

Related projects

Angostura Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the projectIn execution

Chiapas, Mexico/Energy

Angostura Hydroelectric Power Plant

1,000 MW addressed

Electromechanical works associated with the installation of five turbines and generators of 200 MW each, with their complementary systems and execution logistics.

View project
Peñitas Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the projectIn execution

Chiapas, Mexico/Energy

Peñitas Hydroelectric Power Plant

420 MW addressed

Electromechanical disassembly and assembly of four 105 MW generators and their complementary systems, with procedures, quality assurance and testing support.

View project
La Yesca Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the project

Jalisco / Nayarit, Mexico/Energy · Water infrastructure

La Yesca Hydroelectric Power Plant

2 units of 375 MW

Installation of two 375 MW turbine-generator units with testing and commissioning support, plus hydromechanical works on bulkheads, energy-dissipation chambers and large-diameter pipelines.

View project

Next step

Tell us the technical scope you need to cover.

We review technical bases, site conditions and interfaces to propose a realistic scope with the group's companies.