El Cajón Hydroelectric Power Plant

A reference from the technical track record of the team and predecessor companies: electromechanical installation and commissioning of turbine-generator units. Power Machines de México is named in the documented reference.

Location
Nayarit, Mexico
Period
Works documented in 2004
El Cajón Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the project
Illustrative image
Project context
Energy
Related expertise
Energy

Work performed by Duero

  • Electromechanical installation of turbine-generator units
  • Commissioning

The year refers to the work described in the corporate CV, not to the entire construction period or the age of the current entity.

Related projects

Huites Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the projectIllustrative image

Sinaloa, Mexico/Energy

Huites Hydroelectric Power Plant

Works documented in 1993

2 × 230 MW Francis turbines

A reference from the technical track record of the team and predecessor companies: electromechanical equipment installation and commissioning, including two 230 MW Francis turbines. Siemens México is named in the documented reference.

View project
Malpaso Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the projectIn executionIllustrative image

Chiapas, Mexico/Energy

Malpaso Hydroelectric Power Plant

1,200 MW addressed

Plant repowering: electromechanical disassembly and assembly of six turbines and generators of 200 MW each, together with their complementary systems.

View project
Angostura Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the projectIn executionIllustrative image

Chiapas, Mexico/Energy

Angostura Hydroelectric Power Plant

1,000 MW addressed

Electromechanical works associated with the installation of five turbines and generators of 200 MW each, with their complementary systems and execution logistics.

View project

Next step

Tell us the technical scope you need to cover.

We review technical bases, site conditions and interfaces to propose a realistic scope with the group's companies.