Atotonilco Wastewater Treatment Plant

Large-scale wastewater sanitation and treatment project: supply, fabrication and installation of electromechanical pretreatment and solids-handling systems. Sociedad de Aguas Hispanomexicanas is named in the documented reference.

Location
Hidalgo, Mexico
Period
Works documented in 2012
Atotonilco Wastewater Treatment Plant — Illustrative photograph of sector infrastructure, not of the project
Illustrative image
Project context
Water Infrastructure
Related expertise
Water Infrastructure

Work performed by Duero

  • Supply, fabrication and installation of electromechanical pretreatment and solids-handling systems
  • Supply, fabrication and installation of grease concentrator systems
  • Quality inspection and assurance per specifications

The year refers to the work described in the corporate CV, not to the entire construction period or the age of the current entity.

Related projects

La Yesca Hydroelectric Power Plant — Illustrative photograph of sector infrastructure, not of the projectIllustrative image

Jalisco / Nayarit, Mexico/Energy · Water Infrastructure

La Yesca Hydroelectric Power Plant

Hydromechanical works documented in 2011–2012

2 units of 375 MW

Installation of two 375 MW turbine-generator units with testing and commissioning support, plus hydromechanical works on bulkheads, energy-dissipation chambers and large-diameter pipelines.

View project
Panama Canal Expansion — Illustrative photograph of sector infrastructure, not of the projectIllustrative image

Panama/Water Infrastructure

Panama Canal Expansion

Hydromechanical equipment for the locks

Installation of hydromechanical equipment and hydraulic systems for the locks, including gates, operating mechanisms, hydraulic power units and pipelines.

View project
El Cuchillo II Aqueduct — Illustrative photograph of sector infrastructure, not of the projectIllustrative image

Nuevo León, Mexico/Water Infrastructure

El Cuchillo II Aqueduct

Engineering documented in 2023

84-inch conveyance line

Multidisciplinary engineering for five pumping plants and the 84-inch conveyance line, with transient analysis, interface coordination and technical support for implementation.

View project

Next step

Tell us the technical scope you need to cover.

We review technical bases, site conditions and interfaces to propose a realistic scope with the group's companies.