Electromechanical works associated with the installation of five turbines and generators of 200 MW each, with their complementary systems and execution logistics.
Electromechanical disassembly and assembly of four 105 MW generators and their complementary systems, with procedures, quality assurance and testing support.
A reference from the technical track record of the team and predecessor companies: electromechanical equipment installation and commissioning, including two 230 MW Francis turbines. Siemens México is named in the documented reference.
A reference from the technical track record of the team and predecessor companies: electromechanical installation and commissioning of turbine-generator units. Power Machines de México is named in the documented reference.
Jalisco / Nayarit, Mexico/Energy · Water Infrastructure
La Yesca Hydroelectric Power Plant
Hydromechanical works documented in 2011–2012
2 units of 375 MW
Installation of two 375 MW turbine-generator units with testing and commissioning support, plus hydromechanical works on bulkheads, energy-dissipation chambers and large-diameter pipelines.
The “In execution” status of Malpaso, Angostura and Peñitas was confirmed in September 2026. For the remaining projects only the documented period is stated.
Next step
Tell us the technical scope you need to cover.
We review technical bases, site conditions and interfaces to propose a realistic scope with the group's companies.